Skip to content
ADS-TEC Energy Projectleader Patrick Weiss (li) with BOSCH Projectleader Samuel Del Collado

Image -

ADS-TEC Energy Projectleader Patrick Weiss (li) with BOSCH Projectleader Samuel Del Collado

go to media item
License:
Media Use
The content may be downloaded by journalists, bloggers, columnists, creators of public opinion, etc. It can be used and shared in different media channels to convey, narrate, and comment on your press releases, posts, or information, provided that the content is unmodified. The author or creator shall be attributed to the extent and in the manner required by good practice (this means, for example, that photographers should be attributed).
Copyright:
ADS-TEC Energy
File format:
.jpg
Size:
3600 x 2400, 5.14 MB
Download

Categories

Contacts

Stephannie Depa - USA

Stephannie Depa - USA

Press contact Breakaway Communications +1 530 864 0136
Dennis Mueller

Dennis Mueller

Press contact SVP Product Marketing & Communication ADS-TEC Energy

Related content

Battery power plant from ADS-TEC Energy for Bosch in Reutlingen

BOSCH sets up a three-megawatt battery power plant from ADS-TEC Energy in Reutlingen, Germany

A new large-scale battery storage system with a total output of 2.9 megawatts and a capacity of 3.4 megawatt hours has been in operation at Robert BOSCH in Reutlingen since the end of May 2022. The power plant is integrated into the site's smart grid and cushions load peaks that are mainly caused by the production of semiconductors. The plant is scalable and can grow with demand.